Jochen Deibele wrote on Wed, 01 March 2006 00:32
> Oh, you're right. I can make it smaller (move the line to the right), but i can't expand it. Can you expand the gantt chart?
No, but that's intended. If you want a larger report interval you have to specify that interval.
Quote:
> Or is there a way to skip other tasks from scheduling if the limit is reached? (sorry, at the moment I don't have the time to dive into the scheduling code)
No, there is not. Checking the limit is the time consuming part, not surpressing allocations in case the limit is reached.
Chris